Lausanne Metro BEM 4/6

Delivery: 2013-2014

For this customer Vossloh Kiepe is refurbishing eight vehicles, with the option for another 14: the six-axle bidirectional articulated light railcars model BEM 4/6. For each vehicle the company is supplying two UTA 201 DC traction assemblies and a main controller. The first shipments are scheduled for the latter half of 2012, with commissioning in Q1/2013. The vehicles were built at the start of the 1990s by VeVey S.A., the electrical equipment was sourced from ABB.

Download: 816_02 Lausanne_EN.pdf (Size: 387.0 KB)